Repair of industrial facilities

Repair of concrete and steel facilities in industry:

  • silo
  • cooling towers
  • columns
  • pools...etc.
GALLERY

Completed projects

  • Period 2020

    Solana d.d. Tuzla, Bosnia and Herzegovina

    Rehabilitation of production plant 6- Factory for production of salt
    removal of damaged concrete
    hydrodynamic cleaning of columns, beams and slabs and removal of weak and degraded concrete
    sandblasting, removal of damaged reinforced steel and anti-corrosion protection
    repair of damaged concrete surface with repair mortars
    surface protection with polymer cement waterproofing compound.
    Contracting authority: Solana d.d. Tuzla, Bosnia and Herzegovina, 2020.

  • Period 2019-2020

    Elektrani Severna Makedonija REK Bitola

    Rehabilitation of hyperboloid cooling tower unit 2. Repair of reinforced concrete structure from inside and outside (40.000m²).
    removal of damaged concrete
    hydrodynamic cleaning of cleaning of concrete surface
    sandblasting, replacement od damaged and protection of reinforcement
    repair of damaged concrete surface with repair mortars
    surface protection with coatings.
    Contracting authority: Elektrani na Severna Makedonija REK Bitola, 2019-2020.

  • Period 2018

    Water supply company Gradiška, Bosna and Herzegovina

    Repair of water tower H=50m in City Gradiška
    hydrodynamic cleaning of the tower made of brick and reinforced concrete
    repair and protection of concrete and brick surface (reparation, cleaning from algae and moss, protection with coatings)
    sandblasting and anti corrosive protection of steel pipelines
    sandblasting and anti corrosive protection of steel construction inside of tower (stairs and platforms)
    anti-corrosive protection of steel tank water tower with coatings for drinking water.
    Investor: Water supply company Gradiška, Bosna and Herzegovina, 2018.

  • Period 2017

    Power plant "Ugljevik", Ugljevik, Bosnia and Herzegovina

    Repair of water treatment facility on Power plant Ugljevik:
    hydrodynamic cleaning (water blasting) reinforced concrete surfaces on the inside and outside.
    repair of damaged concrete surface with cement and epoxy repair mortars
    injection of cracks with epoxy mass
    application on inside concrete surface layer of epoxy-cement mortar
    installation of sealing strips on expansion joints
    protection of the inner concrete surface with epoxy, chemical resistant coating
    protection of the external concrete surface with coatings based on metal- acrylic resins
    protection of walkway with epoxy-cement mortar.
    Contracting authority: Z.P. "Rudnik i Termoelektrana Ugljevik", Bosnia and Herzegovina, 2017.

  • Period 2017

    Public enterprise "Elektroprivreda BiH", Power plant Tuzla, Bosnia and Herzegovina

    Repair of natural cooling tower RT-1 H=62m in Power plant Tuzla:
    temporally pre-stressing, dismantling of old cables for pre-stressing and mounting of new cables with supporting elements (anchor blocks, guides)
    strengthening three horizontal rings with CFRP strips
    repair of concrete surface from inside and outside (joint plates, horizontal and inclined beams, triangular plates)
    sand blasting and anti-corrosion protection of the steel construction (handrail on top, ladders).
    Contracting authority: Public enterprise "Elektroprivreda BiH", Power plant Tuzla, Bosnia and Herzegovina, 2017.

  • Period 2012

    Power plant Tuzla, Bosnia and Herzegovina

    Rehabilitation of hyperboloid cooling tower unit 6-215MW. Repair of reinforced concrete structure (cc 34.000m²) from inside and outside. Replacement of lightning arresters – Contracting authority: Public enterprise ”Elektroprivreda BiH”, Power plant Tuzla, Bosnia and Herzegovina, 2012.