Hydrodynamic cleaning

Hydrodynamic cleaning services (cleaning high pressure water jet) of concrete and steel structures.

washing of concrete surfaces, removal of weakly bonded concrete with rehabilitation procedures without damaging the reinforcement and the creation of microcracks,

cleaning of metal surfaces from corrosion deposits, preparing for corrosion protection,

cleaning of pipelines and heat exchangers of debris deposits.


GALLERY

Completed projects

  • Period 2016-2020

    Electricity company FBiH. Power plant Tuzla

    Hydrodynamic cleaning (water under high pressure) of pipe surfaces in boiler no.5 in Thermal power plant Tuzla.
    Contracting authority: JP Elektroprivreda BiH d.d. - Termoelektrana Tuzla, Bosnia and Herzegovina, 2016, 2017, 2018, 2019, 2020.

  • Period 2016

    Power plant Gacko, Bosnia and Herzegovina

    Hydrodynamic cleaning of metal pipeline in the rash from deposits Diameter 200mm (length 1000m).
    Contracting authority: Power plant Gacko, Bosnia and Herzegovina, 2016.

  • Period 2015

    Power plant Gacko, Bosnia and Herzegovina

    Hydrodynamic cleaning of metal pipeline in the rash from deposits Diameter 200mm (length 500m).
    Contracting authority: Power plant Gacko, Bosnia and Herzegovina, 2015.

  • Period 2015

    Power plant Tuzla, Bosnia and Herzegovina

    Hydro-dynamic cleaning (water under high pressure) of pipe surfaces in boiler no.5 in Thermal power plant Tuzla.
    Contracting authority: Electricity company FBiH. Power plant Tuzla, Bosnia and Herzegovina, 2015.

  • Period 2014

    Power plant Kakanj, Bosnia and Herzegovina

    Hydro-dynamic cleaning (water under high pressure) concrete surfaces of shell and walls (made of acid resistant brick) on chimney H=100m and chimney H=300m (about 17.000m²).
    Contracting authority: Electricity company FBiH. Power plant Kakanj, Bosnia and Herzegovina, 2014.

  • Period 2013

    Power plant Tuzla, Bosnia and Herzegovina

    Hydro-dynamic cleaning (water under high pressure) concrete surfaces of shell on chimney, pump station, silo and water treatment object (about 7.000m²).
    Contracting authority: Electricity company FBiH. Power plant Tuzla, Bosnia and Herzegovina, 2013.

  • Period 2013

    Power plant Tuzla, Bosnia and Herzegovina, 2013

    Hydro-dynamic cleaning (water under high pressure) of pipe surfaces in boiler no.4 and no.5 in Thermal power plant Tuzla.
    Contracting authority: Electricity company FBiH. Power plant Tuzla, Bosnia and Herzegovina, 2013.

  • Period 2012

    Power plant Tuzla, Bosnia and HerzegovinaH

    Repair of chimneys and cooling tower unit 6th. Cleaning surfaces and removing damaged concrete with a water jet (approximately 40.000m ²).
    Contracting authority: Electricity company FBiH. Power plant Tuzla, Bosnia and Herzegovina, 2012..

  • Period 2012

    Power plant Ugljevik, Bosnia and Herzegovina

    Cleaning oil pipelines for lubrication the turbine and generator. Disassembly, cleaning, rinsing and erection oil pipeline diameter of 30-300mm (1.200m).
    Contracting authority: Power plant Ugljevik, Bosnia and Herzegovina, 2012.

  • Period 2011

    Power plant Gacko, Bosnia and Herzegovina

    Hydrodynamic cleaning of metal and plastic pipeline in the rash from deposits Diameter 200mm (length 2.300m).
    Contracting authority: Power plant Gacko, Bosnia and Herzegovina, 2011.