Hydrodynamic cleaning services (cleaning high pressure water jet) of concrete and steel structures.
washing of concrete surfaces, removal of weakly bonded concrete with rehabilitation procedures without damaging the reinforcement and the creation of microcracks,
cleaning of metal surfaces from corrosion deposits, preparing for corrosion protection,
cleaning of pipelines and heat exchangers of debris deposits.
Hydrodynamic cleaning (water under high pressure) of pipe
surfaces in boiler no.5 in Thermal power plant Tuzla.
Contracting
authority: JP Elektroprivreda BiH d.d. - Termoelektrana Tuzla,
Bosnia and Herzegovina, 2016, 2017, 2018, 2019, 2020.
Hydrodynamic cleaning of metal pipeline in the rash from
deposits Diameter 200mm (length 1000m).
Contracting
authority: Power plant Gacko, Bosnia and Herzegovina, 2016.
Hydrodynamic cleaning of metal pipeline in the rash from
deposits Diameter 200mm (length 500m).
Contracting
authority: Power plant Gacko, Bosnia and Herzegovina, 2015.
Hydro-dynamic cleaning (water under high pressure) of pipe
surfaces in boiler no.5 in Thermal power plant Tuzla.
Contracting
authority: Electricity company FBiH. Power plant Tuzla, Bosnia
and Herzegovina, 2015.
Hydro-dynamic cleaning (water under high pressure) concrete
surfaces of shell and walls (made of acid resistant brick) on
chimney H=100m and chimney H=300m (about 17.000m²).
Contracting
authority: Electricity company FBiH. Power plant Kakanj,
Bosnia and Herzegovina, 2014.
Hydro-dynamic cleaning (water under high pressure) concrete
surfaces of shell on chimney, pump station, silo and water
treatment object (about 7.000m²).
Contracting authority:
Electricity company FBiH. Power plant Tuzla, Bosnia and
Herzegovina, 2013.
Hydro-dynamic cleaning (water under high pressure) of pipe
surfaces in boiler no.4 and no.5 in Thermal power plant
Tuzla.
Contracting authority: Electricity company FBiH.
Power plant Tuzla, Bosnia and Herzegovina, 2013.
Repair of chimneys and cooling tower unit 6th. Cleaning
surfaces and removing damaged concrete with a water jet
(approximately 40.000m ²).
Contracting authority:
Electricity company FBiH. Power plant Tuzla, Bosnia and
Herzegovina, 2012..
Cleaning oil pipelines for lubrication the turbine and
generator. Disassembly, cleaning, rinsing and erection oil
pipeline diameter of 30-300mm (1.200m).
Contracting
authority: Power plant Ugljevik, Bosnia and Herzegovina, 2012.
Hydrodynamic cleaning of metal and plastic pipeline in the
rash from deposits Diameter 200mm (length 2.300m).
Contracting
authority: Power plant Gacko, Bosnia and Herzegovina, 2011.