Design and construction

Our main activity is design and construction of industrial objects with ”turn-key” system as well as repair, reconstruction and maintenance of existing structures in all its segments.

  • design, manufacture and installation of steel chimneys with stacks made of acid-resistant stainless steel
  • design and construction of reinforced concrete chimneys with stacks made of acid-resistant stainless steel and acid resistant bricks
  • design and reconstruction or repair of existing chimneys
  • design, manufacture and installation of circular and other platforms, ladders and chimney cap
  • design and installation of electrical installation (Aircraft warning lights)
  • design, manufacture and installation lightning rod
  • installation of system for monitoring of the flue gases
  • installation of prefabricated (mounting) chimneys.
GALLERY

Completed projects

  • Period 2018

    KJKP Toplane Sarajevo, Bosnia and Herzegovina

    Construction of reinforced concrete chimney H=62m by turnkey system:
    foundation
    reinforced concrete shell
    production and installation of flue pipes made from acid resistant steel
    design and installation of steel construction on object (ladders and platforms)
    lightning rod and obstruction lights.
    Contracting authority: KJKP Toplane Sarajevo, Bosnia and Herzegovina, 2018.

  • Period 2017

    KJKP Toplane Sarajevo, Bosnia and Herzegovina

    Design of preliminary and main project of new reinforced concrete chimney with smoke pipes made of acid resistant material. Contracting authority: KJKP Toplane Sarajevo, Bosnia and Herzegovina, 2017.

  • Period 2016

    Electric power industry of Croatia, TE-TO Zagreb

    Design of the main repair project of reinforced concrete chimney H=202m (brick and concrete) in Heating company TE-TO Zagreb. Contracting authority: Electric power industry of Croatia, TE-TO Zagreb, Croatia, 2016.

  • Period 2015

    Arcelor Mittal Zenica, Bosnia and Herzegovina

    Design of main project of steel circular platforms and ladders on reinforced concrete chimney Sinter furnace 4 H=150m in factory AM Zenica Aglomeracija. Contracting authority: Steel industry Arcelor Mittal Zenica, Bosnia and Herzegovina, 2015.

  • Period 2013

    Natron-Hayat, Maglaj, Bosnia and Herzegovina

    Construction of main project updates (increase in height from 17.6 m to 23 m) of the Lundberg furnace chimney made of acid-resistant steel - Client: Natron-Hayat doo Maglaj, Bosnia and Herzegovina 2013.

  • Period 2013

    Thermal Power Plant, Kakanj, Bosnia and Herzegovina

    Design of the project for reconstruction of AB chimney H = 100m block 6 in the thermal power plant "Kakanj" (expansion inlet flue, chimney reinforcement) - Client: Electric Power Industry of FBiH, TPP Kakanj, 2013.

  • Period 2008

    Nakaš Sarajevo, Bosnia and Herzegovina

    Design and construction of reinforced concrete chimney h=31m, with three stacks made of acid-resistant steinless steel – Contracting authority: General hospital ”Prim.dr. Abdulah Nakaš” Sarajevo, Bosnia and Herzegovina, 2008.

  • Period 2008

    JKT Toplota i MPP Jedinstvo Užice, Serbia

    Design, delivery, and installation of three multi-layer chimney made of acid-resistant steinless steel with inside diameter 800mm h=78m – Contracting authority: ”JKT Toplota Uzice i MPP Jedinstvo Uzice”, Serbia, 2008.

  • Period 2008

    RTV FBiH Sarajevo, Bosnia and Herzegovina

    Construction of TV converter with antena tower in town Brcko – Contracting authority: RTV Federacije BiH d.o.o. Sarajevo, Bosnia and Herzegovina, 2008.

  • Period 2008

    Toplane Sarajevo, Bosnia and Herzegovina

    Removing old chimney, designing, manufacturing and instalation of new chimney. Material stainless steel, h=15m with diameter Ø400mm in heating boiler room ”Higijena” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 2008.

  • Period 2007

    Tondach Djakovo, Croatia

    Removing old, design, manufacturing and instalation of new multiple layer steel chimney h=18,40 meter for tunnel kiln – Contracting authority: ”TONDACH” Djakovo, Croatia, 2007.

  • Period 2000

    Toplane Sarajevo, Bosnia and Herzegovina

    Design, manufacturing and instalation of multiple layer chimney (with two stacks), h=32m in heating boiler room ”Cengic Vila” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 2000.

  • Period 1998

    Toplane Sarajevo, BiH

    Design, manufacturing and instalation of multiple layer chimney (with two stacks), h=64m in heating boiler room ”Blanke Blazek” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 1998.

  • Period 1998

    Toplane Sarajevo, Bosnia and Herzegovina

    Design, manufacturing and instalation of multiple layer chimney (with two stacks), h=35m in heating boiler room ”Podvoznjak” – Contracting authority: ”KJKP Toplane Sarajevo”, Bosnia and Herzegovina, 1998.